BIG BEAR LAKE NEWS | LOCAL INFRASTRUCTURE · 2026
A new water well is a notable component of Big Bear Lake’s capital program in 2026. The Department of Water and Power says Division Well No. 9 has completed drilling and demonstrated a production rate above 700 gallons per minute, with equipping the well identified as the next phase.
What has been confirmed
DWP’s public project listing describes a $2.78 million project and states that drilling has been completed. It calls Well No. 9 the utility’s highest-producing well based on tests above 700 gallons per minute. That is a reported capacity, not a guarantee of how much water the well supplies customers every day.
Equipment still needed
Before a new well can function as a fully integrated public water source, the project calls for a pump, telemetry, water treatment equipment and a protective enclosure. DWP lists an expected October 2026 completion, which should be treated as a schedule forecast rather than evidence that all equipment is already operating.
Funding and oversight
The department lists a $500,000 Bureau of Reclamation grant together with capacity and ratepayer funding. Residents interested in infrastructure finance can ask for adopted contracts, actual expenditures and follow-up water production data. Funding commitments and final expenditure totals can differ as projects proceed.
What residents should know about local water
Bear Valley relies on local groundwater rather than imported lake water, according to the utility. A new well can increase system options, but long-term supply management also requires monitoring, conservation and maintenance. Big Bear Lake News will follow documented commissioning results and water-system reports.
Official sources
Help this community newspaper grow
Your support helps build coverage for the people and places this local newspaper serves.
Donate once by card ↗Support Big Bear Lake News
Choose how to support Big Bear Lake News:
Credit / Debit Card via StripeChoose an amount from $1. One-time support through the publisher's LINKERNO Stripe account.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Big Bear Lake News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Big Bear Lake News
- Big Bear Lake Animal Care Numbers: Local Shelter, County Field Services and Road Reporting Guide →
- Big Bear Lake Wind Advisory October 22: NWS Warns of 55 mph Gusts and Possible Power Outages →
- Big Bear Lake News: Wolf Reservoir Project Adds 500,000 Gallons of Storage Capacity →
- Big Bear Lake News: City Seeks Bids for 8,730 Feet of Sewer Pipe Rehabilitation in 2026 →
- Big Bear Lake News: $19 Million Garstin Water Operations Facility Advances in 2026 →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.